Trusses Go Up at Kershenstein’s Honka Log Home

01 033_01

On Sunday I stopped by the Kershenstein residence to see what progress has taken place. Along with the upper floor framing and upper framed walls, the upper level trusses look to be almost all in place. Also on the lower level, temporary bracing is in place until the stone clad concrete masonry columns are built to support the main level deck above.